Jiangxi Boiler Works and Jiangxi Petrochemical Machinery Plant, which belonging to the former Ministry of Mechanical Industry and Ministry of Chemical Industry respectively, were established in 1958 and both of them was one of the key national projects then.
1958
-
Mr. Chenyun, who was one of the core leadership members of China central government then, worked at JLianco for two years and seven months from November 12th, 1969 to April 20th, 1972.
November 12th, 1969 to April 20th, 1972
-
Jiangxi Boiler & Petrochemical Machinery United Co., Ltd. was set up through the amalgamation of Jiangxi Boiler Works and Jiangxi Petrochemical Machinery Plant in April, 1992.
April, 1992
-
After the completion of shareholding system transformation, Jiangxi Jianglian Energy & Environment Co., Ltd. was found in 2001.
2001
-
Chinese President Hu Jintao, the General Secretary of the Central Committee of the Communist Party of China then, visited JLianco on August 31st, 2003.
August 31st, 2003
-
Jiangxi Jianglian International Engineering Co., Ltd., which shall be responsible for developing foreign trade and for concentrating on overseas projects, etc., was set up by JLianco in September, 2007 through cooperation with Tianjin Huaye Engineering Design Co., Ltd.
September, 2007
-
The company converted from a state-owned enterprise into a private shareholding enterprise in March, 2010.
March, 2010.
-
The construction of Gaoxin manufacturing base started on January 30th, 2012 (covering an area of 100000m2).
-
Jiangxi Jianglian Energy & Environment Co., Ltd. was renamed Jianglian Heavy Industry Co., Ltd. in August 2012 upon the approval of State Administration for Industry & Commerce of the People’s Republic of China.
2012
-
JLianco and Ethiopia Sugar Corporation signed the EPC contract with a value of USD 647 million for KURAZ5 sugar factory in 2013, which is the largest ever single order of exporting products in electromechanical industry of Jiangxi Province.
-
Key Technology and Application of Fluidized Bed with High Efficiency & Low Consumption for Coal Fired Industrial Equipment won the Second Award of National Scientific and Technical Progress on December 25th, 2013.
2013
-
Gaoxin manufacturing base had been put into production since March, 2014.
-
Jinxian manufacturing base construction with an area of 400000m2 May, 2014